Skip to content
Lofton & SonsDecks · Fences · Remodeling
Call
Example image, not one of our jobs: a two-level wood deck with black metal balusters and stairs down a sloped back yard.Example

Deck building

Deck builder in Beaverton, Oregon

New decks, and replacements for decks the rain has worn out. Low decks off a slider, raised decks with stairs, and decks on sloped yards.

Licensed, bonded & insuredOregon CCB #234840

What we build

New decks and deck replacements

Photos on this page are examples of the kinds of decks we build, not Lofton jobs. They'll be replaced by job photos.

Example image, not one of our jobs: a low grey-brown composite deck with one step, outside a sliding door.Example
Example: Low composite deck

Low decks

A step or two down from a sliding door to the lawn. The state permit rule starts above 30 inches, and city and HOA rules apply at any height.

Example image, not one of our jobs: a two-level wood deck with black metal balusters and stairs down a sloped back yard.Example
Example: Two-level deck on a sloped yard

Raised decks and stairs

Second-storey decks and decks on a slope, with stairs down to the yard and railings around the edge. A deck this high needs a building permit.

Example image, not one of our jobs: new deck joists and beams on posts and concrete footings, with a ledger on the house wall.Example
Example: Deck framing before boards go on

Under the boards

What holds a deck up

  • Footings and posts. Concrete footings carry the posts, and the posts carry the beams.
  • Beams and joists. The frame the deck boards sit on. Its spacing depends on the board you choose.
  • The ledger. Where a deck meets the house, the board bolted to the wall needs flashing to keep rain out of the wall.

In a climate with about 37 inches of rain a year, these hidden parts are what wear out first on an old deck.

Permits

Deck permit rules in Oregon

The state rule is about height. Cities can add their own.

Do I need a permit?

In Oregon, a deck more than 30 inches above the ground at any point needs a building permit, and so do the stairs to it.

Your city, your zone and your HOA can add their own rules on height, setbacks and approval. Ask about your address when you call.

Source: Oregon Building Codes Division . Checked November 14, 2026.

City rules: Beaverton, Tigard, Lake Oswego

Example image, not one of our jobs: an old grey deck with cracked boards, moss on the steps and a loose railing post.Example
Example: Worn-out deck

Signs an old deck is done

  • Soft, split or bouncy boards
  • Railings or posts that move when you lean on them
  • Moss and dark stains that come back each winter
  • Stairs that rock, or a ledger pulling away from the house

Questions

Deck questions

Do I need a permit for a deck?

In Oregon, a deck more than 30 inches above the ground at any point needs a building permit, and so do the stairs to it. Your city, your zone and your HOA can add their own rules on height, setbacks and approval. Ask about your address when you call.

Can you replace an old deck in the same spot?

Yes. Replacing a worn-out deck is one of the most common deck jobs. Tell us its size and height, and send photos if you have them.

Which material should I pick?

Cedar, pressure-treated and composite each have trade-offs in cost and upkeep. We talk it through when you call, based on the yard and how you use it.

Are you licensed?

Yes. Lofton & Sons LLC is licensed, bonded & insured, Oregon CCB #234840, Residential General Contractor.

Planning a deck?

Call Jared with the size, the town and what you have in mind. Photos of the yard help if you have them.

Licensed, bonded & insuredOregon CCB #234840